The timeline

Four phases.
All four, handled.

I

Design

1–2 weeks

Free site survey, render, fixed quote.

II

Fabrication

5–7 weeks

Hand-welded in our Vancouver workshop.

III

Shipping

~ 1 week

Crated and delivered to your site.

IV

On-site install

5 days

Place, plumb, balance, fill. First soak on day five.

For comparison — a traditional in-ground pool takes four to six months on-site, with excavation, concrete cure, and tile work. As a wellness pool and hot tub alternative, Nore Haus does the heavy work in the workshop. Your yard is occupied for five days, not five months.

What's in the kit

Three layers.
Pick how far you want to go.

Every Nore Haus starts with the plunge pool. From there, add a sauna and seating to build the full wellness pool — a hot tub alternative with a genuine cold side — or add lockers, branded towels, and an operations manual to turn it into a rental.

Layer 01 · In every kit

The plunge pool.

  • One vessel, two temperatures — hot soak on one side, cold plunge on the other
  • 3 stock sizes · 6′×10′, 7′×12′, 8′×15′ · all 4′ deep
  • Custom sizes available · quoted on site survey
  • Hot side · up to 38°C / 104°F · magnesium-mineral water
  • Cold side · down to 4°C / 39°F
  • 316L marine steel · hand-welded in Vancouver

Kit 02 · adds

+ cedar sauna & jets.

  • Steps up to the medium pool · 7′×12′×4′
  • Cedar sauna · 4–6 person · Finnish stove
  • Jet spa built into the hot side

Kit 03 · adds

+ size & outdoor shower.

  • Steps up to the large pool · 8′×15′×4′
  • 8–10 person cedar sauna
  • Outdoor shower fixture · hot & cold rinse
  • Optional Nore Haus Circle host onboarding

Why it's easy to install

Above grade. No excavation. No permit nightmare.

A

No excavation

Installed above-ground on a prepared pad. Your yard stays your yard. No machinery, no torn-up landscaping.

B

Portable, not real estate

Legally classified as personal property. Take it with you when you move, or leave it to add resale value.

C

We handle the permits

Our team coordinates with your city. Most jurisdictions clear above-grade kits in days — not months.

See it on your land.

Enter your address. A senior designer reviews your space with satellite imagery and returns a fixed quote within 72 hours.